Policy Update
Rimi Deb
Introduction
The Agartala-Akhaura Cross Border Rail Link became the first direct railway connection between India’s Northeastern state of Tripura and Bangladesh, marking a major step in South Asian regional connectivity (Press Information Bureau [PIB], 2023). This article explains how the link functions and performs, the key challenges it faces, and the measures needed to operationalize it.
Background
The Prime Ministers of India and Bangladesh jointly inaugurated the 12.24 kilometre railway line on November 1, 2023. The line connects Nischintapur in Agartala with Gangasagar near Akhaura. It revives a vital transit corridor that had remained severed since the 1947 partition (PIB, 2023). By linking Tripura directly to Bangladesh’s railway network, the corridor creates a shorter transit route to mainland India, cutting the rail distance between Agartala and Kolkata from roughly 1,600 kilometres to 500 kilometres (Observer Research Foundation [ORF], 2023).
Through the Agartala-Akhaura rail link, New Delhi also attempted to advance the strategic framework of India’s Act East policy by reducing Northeast India’s over-reliance on the Siliguri Corridor (ORF, 2023). The Siliguri Corridor is a narrow land strip which measures roughly 22 kilometres at its narrowest point, serving as the paramount linkage between Northeast India and the rest of India. Consequently, the Siliguri Corridor creates a critical single point of failure. However, the project has not yet yielded substantial positive results to boost the regional commercial, economic, and social ties due to instability in the India-Bangladesh relations (The Assam Tribune, 2026).
Functioning
The Agartala-Akhaura rail link operates through a bilateral execution and financing framework between India and Bangladesh across a total alignment of 12.24 kilometres—with 5.46 kilometres in Tripura, India, and 6.78 kilometres in Bangladesh’s Brahmanbaria district (Ministry of Development of North Eastern Region [MDoNER], 2023). The project is divided across distinct national implementing and funding agencies:
Bilateral Funding and Institutional Execution: The Indian Government funded the entire project. The Indian portion is implemented by IRCON and funded by the MDoNER. The Bangladesh portion is implemented by Bangladesh Railway and funded solely by the Indian Ministry of External Affairs at a cost of ₹392.52 crore (MDoNER, 2023). The project aims to provide additional linkage and equally encourage trade between the two countries.
Cross-Border Interchange and Port Integration: Starting from the capital city of Agartala, the rail link connects to Akhaura in Bangladesh’s Brahmanbaria district. Moreover, the train departs from Agartala and the work of immigration and customs checks is handled at the India-Bangladesh border at Nischintapur, while Gangasagar will be the first station in Bangladesh (PIB, 2023). By linking India’s broad gauge network with Bangladesh’s dual gauge tracks, this interchange also integrates Northeast India with Bangladesh’s maritime gateways, specifically the Chattogram Port, to boost regional trade and sea connectivity (ORF, 2023).
Performance
Following the joint inauguration of the Agartala-Akhaura Rail Link on November 1, 2023, an inaugural freight train trial run was conducted from Gangasagar to Nischintapur (PIB, 2023). However, regular passenger and commercial operations have faced delays due to incomplete last-mile terminal works at Nischintapur and political instability in Bangladesh, prompting Northeast Frontier Railway (NFR) to step up inspections in October 2026 to expedite pending works and initiate passenger services (The Assam Tribune, 2026). As regular services have not begun, passenger and cargo data are not yet available.
Distance and journey time: Once fully operational, the Agartala-Akhaura Rail Link will reduce the route distance between Agartala and Kolkata from approximately 1,600 km to 500 km. It is also expected to cut the journey time from 31 hours to around 10 hours (ORF, 2023). This route will also be only an alternative to Tripura. Apart from this, the route will also reduce the over-dependence on the Siliguri Corridor, which will equally benefit neighbouring states of Northeast (Mizoram and southern Assam) and also give Tripura a direct connection to the Chattogram port of Bangladesh (ORF, 2023).
Project cost: The project was first sanctioned at ₹972.52 crore, with ₹580 crore for the Indian portion and ₹392.52 crore for the Bangladesh portion. The sanctioned outlay of the Indian portion was later revised to ₹708.73 crore. This brings the combined outlay to ₹1,101.25 crore (PIB, 2023). This is a revised estimate and not a final project cost. Figures differ across reports because they were published on different dates.
Key Challenges
Despite its strategic promises, the dream of trade and economic prosperity covering both the countries has remained unfulfilled due to several political, administrative, and infrastructural bottlenecks:
Bilateral Political Instability and Diplomatic Friction: Political turmoil in Bangladesh, including the ouster of former Prime Minister Sheikh Hasina in August 2024 and her subsequent stay in India, has strained relations between New Delhi and Dhaka. This has stalled the much-hyped Agartala-Akhaura railway connectivity (The Assam Tribune, 2026). Consequently, the disruption in political relations has also delayed its commercial launch, leaving the Northeast behind from its future alternative transit corridor to Kolkata and the Chattogram port.
Repeated Deadline Postponements and Asymmetric Completion: The project completion deadline has been postponed three times due to land acquisition hurdles and security risks. For example, political instability in Bangladesh has occasionally spilled over into railway infrastructure. In November 2026, a coach of a Dhaka-bound commuter train was set on fire near the Akhaura Railway Junction in Brahmanbaria amid fresh political clashes, highlighting persistent security risks along the corridor (All India Radio, 2026). While the Indian side of the project, from Agartala Railway Station to Nischintapur yard (5.46 km), was commissioned, full cross-border functionality (6.78 km) on the Bangladesh side is still pending (The Assam Tribune, 2026).
Last-Mile Terminal and Gauge Interoperability Hurdles: Even after the November 2023 freight trial run, regular passenger and commercial operations were delayed by pending last-mile facilities at the Nischintapur international immigration station (The Assam Tribune, 2026). Furthermore, managing smooth transshipment between India’s broad-gauge network and Bangladesh’s dual-gauge system requires synchronized customs, immigration, and cargo-handling protocols to prevent border dwell times.
Measures
To overcome these hurdles and realize the corridor’s full economic potential, the following policy measures are essential:
Pillar 1: Leverage Geoeconomic Reciprocity to Secure Reliable Transit: India can accelerate the Agartala-Akhaura rail connection by offering mutual economic ties. For example, through rail transit access India can export essential needs such as supplying cotton yarn and refined petroleum products (including diesel from Assam’s Numaligarh Refinery) overland and via cross-border links. As a result, India can in return foresee stable political ties with Dhaka to keep the Akhaura–Chattogram rail corridor active regardless of political transitions.
Pillar 2: Institutionalize Joint Border and Railway Management: To prevent border security concerns, smuggling, or diplomatic disruption from halting rail operations, India and Bangladesh should emphasise in empowering technical Joint Border Management and Railway Committees, which will handle the situation by tracking safety and providing operational protocols along the Nischintapur–Akhaura stretch.
Pillar 3: Digitalize the Nischintapur–Akhaura Land Customs Station (LCS): Rather than relying on slow manual inspections during gauge transshipment at Nischintapur, customs authorities (CBIC and Bangladesh Customs) should deploy automated RFID tracking, Electronic Data Interchange (EDI), non-intrusive container scanners, and a Joint Single Window Interface for Trade (SWIFT) to enable pre-arrival digital clearance and cut border dwell times.
Conclusion
The Agartala-Akhaura rail link can cut the journey between Kolkata and Tripura from 31 hours to around 10 hours. It also offers the Northeast an alternative to the Siliguri Corridor and reduces over-reliance on it. However, political turmoil in Bangladesh, repeated delays and last-mile hurdles have kept the link from becoming operational.
To change this, India and Bangladesh should tie transit access to geoeconomic reciprocity and empower joint border management committees. They should also digitalize the Nischintapur–Akhaura Land Customs Station. These steps can make the link a reliable corridor for regional trade.
About the Author
Rimi Deb is a Political Science graduate from Assam University, Silchar (Diphu Government College), currently serving as a Public Policy Intern at the Dibrugarh Municipal Corporation (DMC) and a Research Intern at IMPRI (Impact and Policy Research Institute). Her academic and policy interests lie at the intersection of public policy, geoeconomics, regional connectivity, and international relations.
Acknowledgement
The author sincerely thanks the IMPRI team for their guidance and support throughout the preparation of this Policy Update. The author also acknowledges the valuable feedback and constructive suggestions provided by the reviewer, Shiva Karthik, which helped improve the clarity, structure, and analytical depth of the article.
Disclaimer
All views expressed in the article belong solely to the author and not necessarily to the organization.
References
All India Radio. (2026, November 11). Bangladesh witnesses fresh incidents of violence, arson and clashes amid political uncertainty. https://newsonair.gov.in/bangladesh-witnesses-fresh-incidents-of-violence-arson-and-clashes-amid-political-uncertainty/
Ministry of Development of North Eastern Region (MDoNER). (2023, December 7). Agartala–Akhaura railway project (Rajya Sabha Unstarred Question No. 509). Government of India. https://rsdebate.nic.in/bitstream/123456789/746062/1/PQ_262_07122023_U509_p369_p370.pdf
Observer Research Foundation. (2023, November 2). Significance of the Akhaura–Agartala rail link for India and Bangladesh. https://www.orfonline.org/expert-speak/significance-of-the-akhaura-agartala-rail-link-for-india-and-bangladesh
Press Information Bureau. (2023, November 1). Joint inauguration of Agartala–Akhaura cross-border rail link project [Press release]. Ministry of Development of North Eastern Region, Government of India. https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1973818
The Assam Tribune. (2026, October 18). NFR fast-tracks Agartala–Akhaura rail link to boost Tripura–Bangladesh connectivity. https://assamtribune.com/north-east/nfr-fast-tracks-agartala-akhaura-rail-link-to-boost-tripura-bangladesh-connectivity-1620584